E1.
A New World of ChallengesThree new teams begin their projects; Matt and Amy Hill realize building in snow is complicated; Mike and Dan Owens mill the lumber needed for their build; Jackie Keizer hires a team that struggles to bring out an excavator to dig her foundation.
E2.
Snowball EffectAt Jackie's slippery build site, rain and mud hinder the team at every step; the Hills are forced to dig their supplies out of three feet of snow; the Owen family works to overcome missing pieces of their log walls.
E3.
Family Is a Good ThingThe Hills race to finish installing their floor which leads to an on-site injury; Jackie and her team run into problems when their build materials start to fall apart; the Owens struggle to install flooring before being buried by a snowstorm.
E4.
This Is the Sketchy PartThe Hills work on their first-floor framing, but work slows to a stop when their tools begin to freeze; the Owens work on installing the second-story gables; Jackie and her team work to finish the cabin's roof structure.
E5.
This Was a Rough OneThe Owens work to finish the roof, but multiple falling objects and whiteout conditions make the job perilous; Jackie and her team struggle lifting the 250-pound stove from the bay up to the cabin; the Hills find their materials buried under snow.